background image

Valtis Ogrevanje d.o.o.

 

  Instructions for installers and maintenance workers

 

 

8.

 

The parameter menu is closed by pressing the key no. 5 for 3s or more 

After the parameters have been changed, it is necessary to lock the electronics for safety reasons. 
This  is  done  by  repeating  steps  1-4  and  changing  the  values  for  P1A  and  P1d  (different  from 
10:03). 

Now the furnace is ready for start-up. First, perform a dry run. The purpose of this is to check that 
all electronic components are working correctly. Start-up and control procedure: 

 

Close the door and press the power button (no. 1). Blov is displayed on the screen and the 
seconds count down below. At this stage, check if the fan is rotating.  

 

The  next  step  is to  check  the  primary  and  secondary  air  flaps.  Look  through the  lid  (with 
the 

λ

 cut out) to see if the flaps have started to open. The upper flap regulates the primary 

air and the lower flap the secondary air. The opening procedure at switch-on is as follows: 
 

o

 

The lower flap remains closed. 

o

 

Top hatch opens to 100% 
 

When  the  sensor  detects  a  fire  in  the  firebox,  it  starts  to  regulate  both  flaps.  In  the  first 
stage, the primary air flap will be almost fully open (it must reach a fume temperature of 

180 °C). When the boiler reaches an operating temperature of 180 °C, it starts to close the 

primary air flap and open the secondary air flap.   
Check that the mixing valve backflow preventer is correctly connected (at this stage it must 
be actuated by the electronics). 

 

Next comes the start-up. Explain to the customer which button to press for start-up, how 
to load the wood and the recommended burning procedure.  

We explain to the customer that the door must be closed at all times, except when refuelling. To 
control the combustion, press the button no. 2, with which the temperature of the fumes and the 
return duct are checked. If this temperature does not rise within the first 15 minutes, then repeat 
the firing process. 

FUEL 

The fuel used in the boiler must be firewood with a maximum length of 500 mm and an average diameter 
of 10 cm. Round pieces of wood smaller than 8 cm are not split, but can be placed between the firewood. 
All types of wood with a maximum moisture content of 20% can be burned. The boiler output is 
determined by the type and dryness of the firewood.  
 
 

 

 

 

 

 

Summary of Contents for Viva GT

Page 1: ...Valtis ogrevanje d o o Cesta k Tamu 61 2000 Maribor Manual for Maintenance Workers Viva GT V_06032020...

Page 2: ...Fume extraction duct 2 Combustion chamber 3 Loading bay door 4 Ash cleanout doors 5 Smoke chamber cover 6 Firewood storage 7 Belimo air intake motors 8 Boiler heat exchanger 9 Fan 10 Chimney connectio...

Page 3: ...mixing valve 5 4 with motor drive e g PROMIX AVC05 5Nm 2 min 230V and flow pumps 25 60 180 or the exact equivalent of the one described The diameter of the pipe between the boiler and the water stora...

Page 4: ...p 4 Thermal discharge safety device 5 Visible outflow into the canal INSPECTION OF THE CORRECT INSTALLATION OF THE STS SAFETY VALVE MINIMUM WALL CLEARANCE In order for the manufacturer to ensure troub...

Page 5: ...OFF is displayed on the top screen To get to the parameter change menu you must first unlock the electronics The procedure for unlocking the electronics is as follows 1 Hold the bottom right button no...

Page 6: ...tects a fire in the firebox it starts to regulate both flaps In the first stage the primary air flap will be almost fully open it must reach a fume temperature of 180 C When the boiler reaches an oper...

Page 7: ...n the lower layer The smaller the material the less you can mix in Inappropriate fuels Moist fuels with more than 20 water are not allowed They cause water to accumulate corroding the walls of the boi...

Page 8: ...output only rated output only kW Boiler connection voltage 230 50 230 50 V Hz Required chimney draft 10 15 10 15 Pa Fumes temperature 100 200 100 200 C Test pressure 4 5 4 5 bar Boiler class EN303 5...

Page 9: ...llers and maintenance workers CONNECTING THE BOILER TO THE ELECTRICITY GRID The connection of the boiler to the electricity grid and the input output components valves pump sensors is done via the ter...

Page 10: ...connect the electrical voltage We take into account that the water in the boiler should be below 30 C 1 Place the fume sensor in the correct position Keep him in the cocoon deep in the ribs 2 Insert t...

Page 11: ...ecessary to know that the boiler temperature must be below 30 C Once this operation is finished the process is complete When it comes to this version of the program it is important to note that The La...

Page 12: ...cally check the sensor the suitability of the insulation Change the sensor Displayed when the regulation has not detected a fume sensor Check the connection where the sensor is connected Physically ch...

Page 13: ...the area below the heat exchanger Clogged chimney Try to change the activation of heating pumps with external control Clean the walls of the boiler Clean the heat exchanger Clean the ash in the area...

Page 14: ...ELOW THE REGISTER Clean the chamber walls Clear the ashes INSPECTION OF DOORS AND COVERS Inspection of insulation inserts Inspection and replacement of the sealing cord Check for leaks INSPECTION OF C...