background image

Assembly 

Step 1

Remove transportation blocks 
from the bottom of each panel 
before beginning assembly. 
Each Panel should have two 
blocks.

Step 2

Place floor on a firm and 
level base, ensure base has 
suitable drainage  free from 
areas where standing water 
can collect.  (see front page 
on base requirements). 

Step 3

Do not secure the building 
to the floor until the roof is 
fitted. Fix the panels onto 
the floor using 50mm 
screws in alignment with 
the floor joists

Fix the corners with 3x 
50mm screw a shown in 
diagram.

Position the panels so there is 
equal spacing between the 
floor and cladding on all 4 sides

9 x 50mm screws

Step 4

Fix 

door gable

 and 

front panel 

using same method shown in 
step 3.

15 x 50mm screws

Step 5

Place the 

Gable Top

 onto the 

plain gable, ensuring the 
cladding and framing on either 
side is flush with gable. Fix with 
2x30mm screws as shown in 
diagram.

4 x 30mm screws

*Shiplap Only

*Shiplap Only