P 4
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
3
9
Step 4
Attach the panel frame (
No. 9
) to the
rear of the left gable (
No. 3
) using
3x50mm screws.
*Ensure the panel frame is level with
the framing at the bottom of the
left gable.
3x50mm Screws
Pre drill
hole
50mm
screw
4
a
b
a
b
b
b
Step 5
Place the left and right gable(
s
)
(
No’s. 3 & 4
) onto the floor and
fix together using 3x50mm
screws. Ensure to secure through
the right gable into the panel
frame.
Do
NOT
secure the building to
the floor until after the roof has
been fitted.
3x50mm Screws
a
b
Pre drill
hole
50mm
screw
2
a
b
a
a
Step 5
Following the same method
outlined in
Step 4
fix the first
window panel (
No. 2
) into
position, securing at the
corner with 3x50mm screws.
Do
NOT
secure the building to
the floor until after the roof has
been fitted.
3x50mm Screws
a
b
Pre drill
hole
50mm
screw
Step 6
Following the same method
outlined in
Step 4
fix the
second window panel (
No. 2
)
and door panel (
No. 1
) into
position, securing at the
corner(
s
) with 3x50mm screws.
Do
NOT
secure the building to
the floor until after the roof has
been fitted.
9x50mm Screws
a
b
Pre drill
hole
50mm
screw
a
a
a
a
a
a
a
a
a
b
b
b
b
2
1