First position the
Front Roof
support bar
in the centre of
the building between the front
of the building and the large
roof support bar. Ensure the top
face of the support is level with
the top of the building and
then fix using L’brackets.
Position the
Back Roof
support bar
in the centre of
the building between the back
and the large roof support bar.
Ensure the top face of the
support is level with the top of
the building and then mark
position below the framing for
the fittings.
Using the marked position,
align the
roof support block
and fix using 2x100mm screws
diagonaly through the block.
At the front, secure the
support
bar
into position using
L’
Brackets
.
Step 8
4x30mm screws
4x30mm screws
20x30mm screws
2x100mm screws
2x100mm screws
Roof support must be
level with top of framing
Step 9
Layout the
roof sheet
and
position the
roof framing
onto
the sheet, as shown in diagram.
Ensure framing is level around
the edges and fix each piece
using 40mm screws
Rear roof framing
Rear roof framing
Side roof framing
Side roof framing
Front roof framing
17x40mm screws
1
2
3
50
mm
50
mm
50
mm
3020mm
1000mm
1420mm
50
mm
Cut three strips from roll of felt,
2x3020mm and 1x1420mm in
length. Place felt on top of roof
sheet and align as shown in
diagram ensuring strip 3 over
hangs the front by 50mm. with
equal spacing at each corner.
Ensure strip 1 is the first piece
placed down then lay sheet 2 and
then 3 on top. make sure each
sheet overlaps the next creating a
run off.
Use a fascia as a guide to mark out
the angled cuts including 50mm
overhang.
Cut the sides as shown in diagram
at the dotted lines, use fascia
width as guide for overhang. Cut
Triangle with 50mm overhang
again using fascia as a guide.
Fix roof to building as shown in
step 7, then place sheets back into
position in diagram with 50mm
over hang all around. fix each
sheet using felt tacks along where
sheet overlap.
Step 10
Place the roof section on top of
builidng, ensure roof framing
slots over each side.
Fix the roof sheet into position
using 40mm screws ensuring
that they line up with the
vertical framing inside the
building and along the length
of the internal roof support
bar.
*It is recommended
to cut the felt sheets
before fixing the roof
to building.
21x40mm screws
Step 11
80x10mm felt tacks