7.0 INFORMATION REGARDING MAINTENANCE
2
FIL.SILOTOP_zero.--.M.A4.0722.EN Issue: A4
07.22
34
Component
SCHEDULED INTERVENTIONS
Operation
Start-
up
Daily
Weekly
Each
1
month
Each
3
months
Each
6
months
Each
12
months
CLEANING
SYSTEM
Check the efficiency
of the dryer and
oil separator
Drain the condensate from
the tank
Check if pressure is being fed
and the value
Check if it works properly, the
sealing efficiency and wear
condition
Check tightening of the coil
fastening bolts
Check its integrity