WWW.
WAMBAM
FENCE.COM
16
ASSEMBLY
INSTRUCTIONS
AF14001
STEP 7:
INSTALL
POSTS
STEP 7.1
Slide a post over the first pipe
anchor. The post will rest on the
edge of the anchor positioner.
STEP 6:
POSITION AND SECURE
LEVELING DONUTS
STEP 6.1
Note:
The
level should sit
on the bottom
of the anchor
positioner.
Note:
The
donut can be
adjusted to compensate
for a slightly crooked pipe
anchor. Slide the donut
either left or right to create
a level plane between the
anchor positioner and the
donut.
Lift the leveling donut to within 1” of the top of the pipe anchor. Adjust the leveling donut as necessary
until it is level with the anchor positioner. The leveling donuts should be aligned with the others in the
fence line. This can be accomplished by using the string line. Fasten the donut to the pipe anchor using
(2) #8 5/8” self-drilling tek screws included in the donut packaging.