5.0 INSTALLATION AND FIXING
2
EXT.SBB-HFF.--.M.A.0219.EN Issue: A
02.19
26
SBB-HFF
1) Verify the presence and integrity of all constitu-
ent parts of the machine which is supplied al-
ready partially assembled.
2) Remove the components of the machine from
the packing by using an appropriate lifting sys-
tem and position them in the proximity of the as-
sembling area, taking care not to damage them.
3) In particular, use the supplied eyebolts for lifting
the hopper.
INSTALLATION - ASSEMBLY OF MODEL C AND S
Summary of Contents for SBB 125 C
Page 57: ......