5.0 INSTALLATION AND FIXING
2
EXT.SBB-HFF.--.M.A.0219.EN Issue: A
02.19
32
SBB-HFF
3) Lift the hopper frame and place it in the final position,
fixing the feet to the ground.
4) Place a rear strut 4 on the ground as shown in the Figure
and connect a cross beam 5 to it by means of screws,
taking care to avoid tightening the screws excessively.
Place the frame down and connect the second rear
strut taking care to orient it as shown in the Figure.
Use a torque wrench to ensure the following tightening
torques:
M16 screws: 225 Nm
M18 screws: 439 Nm
5) Connect a second beam 6 as shown in the Figure, tak-
ing care to avoid tightening the screws excessively.
Use a torque wrench to ensure the following tightening
torques:
M16 screws: 225 Nm
M18 screws: 439 Nm
6) Connect the last cross beam as shown in the Figure,
taking care to avoid tightening the screws excessively.
Use a torque wrench to ensure the following tightening
torques:
M16 screws: 225 Nm
M18 screws: 439 Nm
Summary of Contents for SBB 125 C
Page 57: ......