WP2-8_GB
41 / 189
Before commissioning, it shall always be ensured that all the accessories have been removed
from the
combustion chamber and ash compartment,
while the pellet storage space should
not hold any residual material.
The operator has to
clean
the combustion chamber regularly.
To maintain the heating equipment, it is recommended to conclude a maintenance agreement
between the specialized company and operator. The regular maintenance may also be
performed by the operator having been thoroughly trained by the specialized company, under
technically safe conditions.
Before the commencement of works, the supply power cord shall be disconnected.
The
supply power connection and the socket shall always be easily accessible. It is forbidden to
operate the appliance with a damaged power cord. In case the power supply cord is damaged,
it shall be instantly replaced by a qualified expert in order to avoid emergency situations.
It is
forbidden to unplug the boiler in the course of operation! The boiler shall be switched off
in advance, and the operator shall wait until the equipment fully stops (the fuel burns
down).
Correct operation / handling, as well as appropriate care and maintenance increase the
lifetime and preserve the value of the equipment. It saves valuable resources, spares the
environment and your money.
2. SCALE DRAWING, CABLING DIAGRAM