Installation
[M2001452_0] - EN / 22.06.12
Page 17 of 20
Subject to change without notice
3.11
Attaching the tension cable with the
plastic spring tension device
Marking the fixing points
)
NOTE
The tension cable must be perpendicular to the top
rail.
The lower edge of the tension cable brackets must
be approx. 40 mm below the lower edge of the
bottom rail when the external venetian blind is fully
extended.
Slat size L
Number of cable
guidances
To 3000 mm
2 pieces
To 3500 mm
3 pieces
Tab. 11:
Number of cable guidances depending on order
width
Lower the external venetian blind completely.
Align the tension cable perpendicular to the top rail
and mark its position on the substructure.
Pencil the bottom edge of the bottom rail (plus
40 mm) onto the mounting substructure.
Hold the tension cable
bracket against the mar-
king, properly aligned
both vertically and hori-
zontally.
Transfer the fixing temp-
late of the tension cable
bracket onto the
mounting substructure.
)
NOTE
Pencil in the fixing
positions centrally to
permit corrections
later on.
Drill the fixing holes
depending on the sub-
structure.
Attaching the tension cable brackets
)
NOTE
Check that the substructure is even by holding a
suitable tool (e.g. a spirit level) against it and cor-
rect any unevenness.
Mounting sub-
structure
Fixation suggestion
Aluminium
Screw DIN 7982 4.2 x 13
Masonry
Screw DIN 7997 4 x 40
Dowel S5
Wood
Screw DIN 7997 4 x 20
Thread
Screw DIN 965 M 4 x 8
Tab. 12:
Fixation suggestions for tension cable brackets
(selected mounting substructures)
Attach the tension cable
bracket to the substruc-
ture with suitable fixing
material.
Aligning the tension cable
Check the tension cable
brackets to ensure they
have the same height
(B) and are parallel
(X1 = X2 ± 1 mm).
Measure diagonals "D1"
and "D2". If D1 = D2,
the tension cables are
parallel and at right
angles.