Operation
3.2
Key assignment of slat roof hand-held transmitter (LINE)
Equipment
Number of channels
Drive – tilting (L60) slat roof/tilting and moving (L70) slat roof
1-channel
Direct LED lighting in beam (optional)
1
1-channel
Indirect LED lighting in beam (optional)
1
1-channel
LED lighting in pole (1–4 fields) (optional)
1
1-channel
Radiant heater field 1 (optional)
1
1-channel
Radiant heater field 3 (optional)
1
1-channel
Integrated awning with easyZIP guidance (optional)
2
1 channel/awning
1
The channel is only occupied if the component was contained in the slat roof order.
2
The integrated awning with easyZIP guidance is always programmed for the WMS network after it has been installed.
2029839 [Rev. 9 - en]/2021-10-11
Page 11 | 32