Installation
2021216 [Rev. 2 - en]/2017-04-19
Page 5 | 8
P1/2.Q.20
100
Transfer the attachment
of the fixing bracket at
the top to the mounting
substructure.
Drill the fixing holes.
P1/2.Q.20-23
1
2
Mount the guide rail
over the ceiling profile.
Align the fixing bracket
at the top with the fixing
hole.
Attach the fixing bracket
with the mounting plate.
Installing the clip holders
P1/2.Q.20
=
=
Transfer the fixing of
the clip holders on both
sides to the mounting
substructure.
Drill the fixing holes.
P1/2.Q.20-23
Attach the clip holders
on both sides.
2.6
Installing the pleated blind
Inserting the pleated blind in the ceiling and base
profiles
2
1
3
Insert the package in
the guide rail.
Lower the package into
the base profile.
Remove the safety
straps on the package.
Attaching the end profiles
INFO
First attach the end profile of the package side.
2
1
Swing in the end profile
at the top.
Press on the end profile
to hook it into the brack-
et.
2
1
Press the end profile
against the mounting
substructure and lower
it.
Check if the end profile
is hooked into the clip
holder. If necessary, en-
sure that it is hooked by
pushing on it again.
INFO
Now attach the end profile of the opposite side as
described earlier. When installing, watch the path of
the cords in the base profile (
Correct
Incorrect
Incorrect
Tab. 9:
Position of cords in the base profile