RUN
Before starting the tank, it is necessary to check the correctness of the connection of
the device and the correctness of assembly according to the schemes.
The tank must be filled with water:
•
Open the valve on the cold water supply,
•
Open the hot water intake valve in the system (the outflow of a full stream of
water without air bubbles indicates that the tank is full),
•
Close the tap valves.
TANK EMPTYING
In order to empty the tank of water, it is necessary to:
•
close the valves connecting the exchanger to the heating circuit,
•
close the valve on the cold water supply to the exchanger,
•
Open the drain valve.
Summary of Contents for ZC-02
Page 2: ...Str 2 INS_14092022...
Page 6: ...Str 6 INS_14092022 Tank construction 200 ZC 02...
Page 7: ...Str 7 INS_14092022 Tank dimensions 200 ZC 02...
Page 8: ...Str 8 INS_14092022 Construction TankA 250 ZC 025...
Page 9: ...Str 9 INS_14092022 Tank dimensions 250 ZC 025...
Page 10: ...Str 10 INS_14092022 Construction of tank 250 with two coils ZCC 0 25...
Page 11: ...Str 11 INS_14092022 Tank dimensions 250 with two coils ZCC 025...
Page 12: ...Str 12 INS_14092022 Tank construction 500 ZC 05...
Page 13: ...Str 13 INS_14092022 Tank dimensions 500 ZC 05...
Page 14: ...Str 14 INS_14092022 Tank dimensions 500 with two coils ZCC 05...
Page 15: ...Str 15 INS_14092022 Construction of Tank 500 with two coils ZCC 05...
Page 16: ...Str 16 INS_14092022 Dimensions and construction of the tank 1000 ZC 10...
Page 22: ...Str 22 INS_14092022...