8 FLUES
8.1 Flue Options, Components & Dimensions
The use of any flue system other than that supplied or recommended by the
manufacturer will invalidate the warranty.
The following flue options are available from Warmflow:
FBF
Low Level Balanced Flue Kit
HBF
High Level Balanced Flue Kit
VBF
Vertical Balanced Flue Kit
HFL
Horizontal Entry Flue Liner Kit
VFL
Vertical Entry Flue Liner Kit
UPMK
Utility/Internal Plume Management Kit
KPMK
Kabin Pak/External Plume Management Kit
8.1.1 Conventional Flue Guidelines
The flue system should be designed in accordance with local bye-laws and the
Building Regulations. Draught stabilisers are not recommended for oil fired
boilers. Sharp bends or horizontal runs should be avoided and the flue should
terminate 2 feet (600mm) above the ridge of the dwelling. Terminals which restrict
the discharge or allow ingress of water should be avoided.
When connecting to an existing masonry chimney, a Warmflow HFL or VFL
flexible flue liner suitable for use with oil fired condensing boilers and of an
appropriate diameter must be used. The annular space must be filled with non-
combustible insulation and sealed top and bottom.
Only Warmflow flue systems designed specifically for use with oil-fired condensing
boilers may be used.
Perfector 6 Side:Front
Summary of Contents for Agentis Series
Page 2: ......
Page 30: ...Page 29 4 5 Components 4 5 1 B Series Boilerhouse Casing Key Components...
Page 31: ...Page 30 4 5 2 I Series Internal Casing 21 26 33 Models 44 Models...
Page 32: ...Page 31 4 5 3 I Series Internal Key Components 21 26 33 Models 44 Models...
Page 33: ...Page 32 4 5 4 I Series Internal Pump Group 21 26 33 Models 44 Models...
Page 35: ...Page 34 4 5 7 E Series External Casing 21 26 33 Models 44 Models...
Page 36: ...Page 35 4 5 8 E Series External Key Components 21 26 33 Models 44 Models...
Page 37: ...Page 36 4 5 9 E Series External Pump Group 21 26 33 Models 44 Models...
Page 39: ...Page 38 4 5 12 Combination Boiler Pipe Layout...
Page 41: ...Page 40 5 1 2 I Series Internal I21 I26 I33 5 1 3 I Series Internal I44...
Page 43: ...Page 42 5 1 6 E Series External Base Tray E21 E26 E33 5 1 7 E Series External E44...
Page 45: ...Page 44 5 1 10 E Series External Combination Boiler Base Tray E21C E26C E33C...
Page 61: ...Page 60 6 3 3 External 230V Two Channel Programmer Room Thermostat Optional Outdoor sensor...
Page 62: ...Page 61 6 3 4 Internal Two Channel Programmer and Room Thermostat Optional Outdoor Sensor...
Page 73: ...Page 72 6 6 9 Honeywell Y Plan Independent CH DHW Fully Pumped Only 2 CHANNEL TIMECLOCK...
Page 74: ...Page 73 6 6 10 Honeywell S Plan Independent CH DHW Fully Pumped Only 2 CHANNEL TIMECLOCK...
Page 93: ...Page 92 Kabin Pak External Plume Management Kit KPMK The kit comprises...
Page 107: ...Page 106 11 4 Burner Start Up Cycle Lock out is indicated by a lamp on the control box...
Page 122: ...Page 121 14 SPARES 14 1 RDB 2 2 BX Spares...
Page 124: ...Page 123 14 2 RDB 3 2 BX Spares...
Page 134: ...Page 133 Intentionally left blank...
Page 135: ......