Attention
Before assembling or removing the nozzle,
loosen the screw (A) and move the electrodes
away from the nozzle.
9.3
Electrical Connections
The boiler control equipment and the burner are provided ex works, it is only necessary
to connect a 230V 50Hz supply in accordance with the electrical drawings.
9.4
Electrode Setting
9.5
Burner Start-up Cycle
~ 12s
Thermostat
Motor
Ignition transformer
Valve
Flame
Lock-out lamp
~ 12s
Normal
Lock-out due to failure to light
~ 5s
Page 37