Solid fuel burner, bricked fire

 

Installation Instructions

 

Warmington Evoque 1300

 

 

                                                 

 

Fire, flue system and instructions to comply with ASNZS 2918:2001 & Building Code C1 Outbreak of Fire

 

 

Keep these Instructions for further reference. Ensure that you have the correct and current installation details for the Warmington Fire

 

 

Installation

 

The Warmington unit is to be installed by a certified Warmington installer or an Approved NZHHA Installation Technician.

 

 

 

IMPORTANT 

Read all the instructions carefully before commencing the Installation. Failure to follow these instructions may result in a fire hazard and void the warranty 

Note flue system casing:

 

Flue system may require to be doubled lined to comply to  

ASNZS:2918:2001 4.3 Flue pipe casing.

 

Summary of Contents for Evoque 1300

Page 1: ...Fire Keep these Instructions for further reference Ensure that you have the correct and current installation details for the Warmington Fire Installation The Warmington unit is to be installed by a ce...

Page 2: ...raditional firebox No Traditional firebox 1 Supplied Priced depending on requirements No Warmington flue kit 1 NOT supplied components are required for in stall Priced depending on requirements No Aut...

Page 3: ...ography of the land The slope and position of the land in relation to the home has a bearing on how the wind will interact with the fire and flue system Care needs to be taken to ensure that the flue...

Page 4: ...Heat Cell Clearance Depth N 1105 Heat Cell Clearance Height O 2420 Chimney Clearance Height OO 1500 Minimum Flue Height Flue Height 3600 Measured From Top of Adaptor B F 3600 Check List Firebox Grate...

Page 5: ...sure Height T 2390 Distance to centre of flue U 714 NOTE WITH BLOCK HEAT CELL Timber Framing can be in direct contact with brick alcove Note Centre line of flue is NOT in centre of alcove Description...

Page 6: ...ll holes through base for bolts seismic restraints bolts not provided 4 Install the flue system Ensure that the flue system comply to the latest AS NZS 2918 2001 5 Fit the Autoclaved Concrete ACC heat...

Page 7: ...right to change product specifications without prior notification All Dimension are in mm Copyright 7 BAFFLE POSITION CHAIN AND SPROCKET ACCESS CHANNEL Location where the sprocket and chain access pa...

Page 8: ...low Adjust the counter weight to the required distance by rolling it on its axis then fix it by tightening the brass disks against each other note that the thick brass disk always is at the end of the...

Page 9: ...needed for servicing the sprockets on both sides 2x 165mm air vent outlets into the room 2x 165mm air vent out lets to cool chimney cavity to outside Note venting cone can be used instead 1x 150mm al...

Page 10: ...TD reserves the right to change product specifications without prior notification All Dimension are in mm Copyright 10 VENTING CONCEPT Warm Air Return to Room Vent Grill NOT Provided Cavity Air Ventin...

Page 11: ...right 11 AUTOCLAVED CONCRETE ACC HEAT CELL ACC KITSET ASSEMBLY details The ACC heat cell is constructed around the firebox using 75mm ACC see attached minimum spec below Power panels 2400x600x75 are r...

Page 12: ...prior notification All Dimension are in mm Copyright 12 Note If plastering the heat cell structure it is recom mended to use a fibreglass mesh with a latex plaster to minimise the chance of the plast...

Page 13: ...h 2017 Due to continued product improvement Warmington Ind LTD reserves the right to change product specifications without prior notification All Dimension are in mm Copyright 13 ACC HEAT CELL CROSS S...

Page 14: ...he centre of the fireplace above the door Presetting and changing the setting of the damper control 1 Press the presetting control in order to disengage it from its catches 2 Keeping it pressed make i...

Page 15: ...e top Spider into position ensure that the legs of the spider are fitted inside the liner and that the spider is positioned hard down onto the liner and tighten with the screw and nut 3 Place the flas...

Page 16: ...tite etc an additional flue pipe baffle is required All external air vents and ceiling penetrations must be bird proofed with permanently fixed screens All flashing to comply with E2 Test report numbe...

Page 17: ...CHIMNEY CHASE FLASHING AND AIR VENTILATION OPTIONS VENTING THROUGH CHIMNEY CHASE VENTING THROUGH FLASHING Insulation under flashing CHIMNEY CHASE FLASHING DETAILS SETTING ADD COWL AND FLASHING CONE HE...

Page 18: ...mension are in mm Copyright 18 FLUE HEIGHT MINIMUM DETAILS FRAME OUT AND TRIM OUT DETAILS FOR CHIMNEY CHASE Option X Singled lined flue system Option Y Double lined flue system The flue exits are to c...

Page 19: ...FICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE TESTING AUTHORITY IS CONSIDERED AS BREACHING AS NZS 4013 WARNING DO NOT USE FLAMMABLE LIQUIDS OR AEROSOLS TO START OR REKINDLE TH...

Reviews: