background image

12 April 2023

 

Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.

 

All Dimension are in mm

……. 

Copyright on all products and Specifications © 

 

1

 

Nouveau Grill 1100 

Double Flue

 

Note: FLUE SYSTEMS CASING

 

Flue  system  may  require  to  be  Doubled  lined  to  comply. 

Ref ASNZS:2918:2001 4.3 Flue pipe casing.

 

 

                                

Visit 

www.warmington.co.nz

 

for Spec’s, DWG’s and PDF uploads of Fires

 

 

Fire, Flue System and Instructions to Comply with ASNZS 2918:2001

 

 

Keep these Instructions for further reference

……

Ensure that you have the correct and current Installation details for the Warmington Fire

 

 

Installation

 

The Warmington unit is to be Installed by a Certified Warmington Installer or an Approved NZHHA Installation Technician .

 

See www.homeheat.co.nz/members for a Certified NZHHA SFAIT Installer in your area .

 

 

 

 

IMPORTANT 

Read all the Instructions carefully before commencing the Installation. Failure to follow these Instructions may result in a Fire Hazard and void the warranty . 

Important Note:

 

All Load Bearing Structures are 
to be Engineered to carry load.

 

Outdoor BBQ Cooking Fire - Wood Burner

 

Installation Instructions

 

Summary of Contents for Gas Nouveau SN 1100

Page 1: ...y with ASNZS 2918 2001 Keep these Instructions for further reference Ensure that you have the correct and current Installation details for the Warmington Fire Installation The Warmington unit is to be...

Page 2: ...e To be maintained to the manufactures Instructions Installation Notes A rebate of 40mm is recommended from the front face of the surround to the front of the fire to reduce the ingress of water into...

Page 3: ...0mm into ACC Surround Timber Framing requires 30mm clearances with ACC Surround Note Z dimension is from Flue Centre to Firebox Front Flange Not including 40mm rebate from ACC Enclosure N dimension is...

Page 4: ...nd sides of the Fire box 5 Install the flue system 6 Fit the Hebel Heat cell around the fire A general minimum lay out is shown in this Specification This is a general installation guide only Contact...

Page 5: ...to ACC Sur round Timber Framing requires 30mm clearances with ACC Surround Note If Solid Plastering the structure it is recommended to use a Fibreglass Mesh with a Latex Based Solid Plaster to minimis...

Page 6: ...SN 1100 DF Hearth Width RR 1650 Hearth Projection SS 380 Plinth Width TT 1210 Plinth Depth UU 600 Centre of Flue NN 333 TIMBER PLAN FRONT ELEVATION CROSS SECTION Important Note All Load Bearing Struc...

Page 7: ...dow Height VV 790 Window Width WW 1160 Note Ensure that the Fire and Flue System is Installed before the Alcove access is blocked off Block modules may vary to the drawing see Blocklayer for further d...

Page 8: ...e Solid Plaster crack ing See your Solid Plasterer for correct materials and applications Note HEBEL KITSET ASSEMBLY details When purchasing the Hebel Heat Cell Kit the assembly guide will be included...

Page 9: ...Top Spider into position ensure that the legs of the spider are fitted inside the liner and that the spider is positioned hard down onto the liner and tighten with the screw and nut 3 Place the Flashi...

Page 10: ...n flashing Butynol Dectite an Additional Flue pipe Baffle is required All external air vents ceiling penetrations must be bird proofed with permanently fixed screens All flashing to comply with E2 Tes...

Page 11: ...CHASE FLASHING DETAILS VENTING THROUGH CHIMNEY CHASE VENTING THROUGH FLASHING No Insulation under flashing Insulation under flashing CHIMNEY CHASE FLASHING and AIR VENTILATION OPTIONS Note Flashing S...

Page 12: ...re in mm Copyright on all products and Specifications 12 FLUE HEIGHT MINIMUM DETAILS FRAME OUT AND TRIM OUT DETAILS FOR CHIMNEY CHASE Option X Singled Lined Flue System Option Y Double Lined The flue...

Page 13: ...nsion are in mm Copyright on all products and Specifications 13 Important Note All Load Bearing Structures are to be Engineered to carry load RAISED HEARTH CLEARANCES Mantle Clearances Firebox Y Z SN...

Page 14: ...ls or foreign matter by lighting or igniting the fire or Burner ENSURE THAT THE OUTDOOR FIRE IS WELL VENTILATED WHEN LIGHTING FOR THE FIRST TIME and operate fire on high for up to 5 minutes Cooking ma...

Reviews: