19 August 2021
All dimensions are in mm
Copyright
6
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
PREPARATION AND INSTALLATION
For installing into Warmington SI and SN fires:
•
For new installations, rail burner head will come pre
-
mounted. Route gas and electrical feeds as appropriate.
•
For retrofitting, cut holes in firebox and ash pan as per appropriate drawings.
•
Lastly bolt the leg of the rail
-
burner to the ash pan through the hole that on the foot at the end of the rail
-
burner.
SI FIREBOX CUT PATTERN
SN FIREBOX CUT PATTERN
SI/SN ASH PAN CUT PATTERN