12.
MAINTENANCE
During all repair and maintenance and repair procedures, the
Rotators must be electrically isolated. Do this by switching off
the main supply and unplugging the mains cable.
After disconnecting the power there may be some residual
charges in some components in the panel. Wait for few
minutes after disconnecting the mains power before
commencing work on any electrical elements of the machine.
INSTALLATION
Before starting up , check the following ;
All moving parts can freely move
Check oil level in the gearbox
Check the integrity of all cable, mains and remote box, make
sure there are no cuts
Check the remote box controls all operate correctly
Check the emergency stop on the remote box is working,
FIRST TIME IN RUN
In order for the worm gearbox to reach its optimal efficiency,
when first installed the Rotator should run in both the direction
for the following period of time;
At least 4 hrs. running with no load on Rotators
REPAIR AND MAINTENANCE
To continue the longevity of the equipment, all efforts should
be made to keep the Rotators clean and free from dirt or waste
from welding process.