11
HVAC_BAC_ELECTRIC_IOM_RevCa_0219
READ ALL INSTRUCTIONS CAREFULLY BEFORE BEGINNING.
INSTALLATION OF E026 & E029/
E030 ACTUATORS ON THE VALVE
SEE DRAWING D3400025 on page 17
THE SILVER SPACER RING THAT COMES WITH THE ACTUATOR MUST BE
ASSEMBLED ON TOP SIDE OF YOKE AS SHOWN ON DRAWING.
1) Push valve stem down until plug is seated. Note stem location.
2) Remove stem connector socket head nuts, remove stem
connector U-bolt.
3) Install hex jam nut (Item 5) on valve stem. Thread jam nut so
that one inch of threads are exposed between jam nut and
top of stem.
4) Hold jam nut on valve stem and turn the stem adapter (Item
2) until it bottoms out on the valve stem. Tighten jam nut to
the bottom of the stem adapter to secure valve stem to stem
adapter.
WARNING: THE VALVE STEM SHOULD NEVER BE
TURNED WHILE THE PLUG IS IN CONTACT WITH
THE SEAT OTHERWISE THE SEATING SURFACES
WILL BE DAMAGED VOIDING THE WARRANTY.
5) Place actuator, spacer ring (Item 3) and yoke locknut
(Item 4) over valve stem and onto bonnet. Watch orientation
of spacer ring and yoke locknut. Actuator base must rest on
bonnet. If necessary, use the manual override to raise the
stem connector (See manual override on page 3).
WARNING: DO NOT FORCE OR TURN THE MANUAL
OVERRIDE WHEN THE MANUAL OVERRIDE
BUTTON IS NOT PRESSED. DOING SO MAY CAUSE
DAMAGE TO THE ACTUATOR GEARS.
6) Rotate actuator to desired orientation. For the factory default
actuator position the motor electrical wire end of the actuator
faces the outlet side of a 2-way valve, common “C” port on a
3-way mixing valve, and lower “L” port on a 3-way diverting
valve. Thread yoke locknut onto bonnet and tighted securely.
Use blunt chisel and hammer for tightening.
7) Push valve stem down until plug is seated. Refer to position
noted in Step 1.
8) While holding the bottom of the stem connector open, use
the actuator manual override to lower the stem connector
over the stem adapter (See manual override on page 3).
Install stem connector U-bolt through stem connector.
Watch orientation. The socket head nuts when installed on
the U-bolt must face away from the electrical wire end of the
motor. Install the socket head nuts on the U-bolt. Evenly
torque the socket head nuts to 44 in-lbf torque.
WARNING: DO NOT FORCE OR TURN THE MANUAL
OVERRIDE WHEN THE MANUAL OVERRIDE
BUTTON IS NOT PRESSED. DOING SO MAY CAUSE
DAMAGE TO THE ACTUATOR GEARS.
WARNING: THE VALVE STEM SHOULD NEVER BE
TURNED WHILE THE PLUG IS IN CONTACT WITH
THE SEAT OTHERWISE THE SEATING SURFACES
WILL BE DAMAGED.
9) Connect power and signal to actuator. (See also Set-Up,
page 12)
10) Press the Adaption (Auto-Calibration) button on the
actuator and wait until the cycle is complete.
11) Stroke valve several times to check operation.
12) Return line pressure to valve.
Summary of Contents for E024
Page 16: ...16 2600 Emrick Blvd Bethlehem PA 18020 USA 800 922 0085 www warrencontrols com D3400024...
Page 17: ...17 HVAC_BAC_ELECTRIC_IOM_RevCa_0219 D3400025...
Page 26: ...26 2600 Emrick Blvd Bethlehem PA 18020 USA 800 922 0085 www warrencontrols com NOTES...