According to fuel specification
Fuel viscosity
100°C
Design temperature
If fuel viscosity is higher than 25 cSt/100°C
Preheating
Equal to feed pump capacity
Design flow
1.6 MPa (16 bar)
Design pressure
Fineness:
6
μ
m (absolute mesh size)
- automatic filter
Maximum permitted pressure drops at 14 cSt:
20 kPa (0.2 bar)
- clean filter
80 kPa (0.8 bar)
- alarm
Flow meter, booster unit (1I01)
If a fuel consumption meter is required, it should be fitted between the feed pumps and the
de-aeration tank. When it is desired to monitor the fuel consumption of individual engines in
a multiple engine installation, two flow meters per engine are to be installed: one in the feed
line and one in the return line of each engine.
There should be a by-pass line around the consumption meter, which opens automatically in
case of excessive pressure drop.
If the consumption meter is provided with a prefilter, an alarm for high pressure difference
across the filter is recommended.
De-aeration tank, booster unit (1T08)
It shall be equipped with a low level alarm switch and a vent valve. The vent pipe should, if
possible, be led downwards, e.g. to the overflow tank. The tank must be insulated and equipped
with a heating coil. The volume of the tank should be at least 100 l.
Circulation pump, booster unit (1P06)
The purpose of this pump is to circulate the fuel in the system and to maintain the required
pressure at the injection pumps, which is stated in the chapter Technical data. By circulating
the fuel in the system it also maintains correct viscosity, and keeps the piping and the injection
pumps at operating temperature.
Heater, booster unit (1E02)
The heater must be able to maintain a fuel viscosity of 14 cSt at maximum fuel consumption,
with fuel of the specified grade and a given day tank temperature (required viscosity at injection
pumps stated in Technical data). When operating on high viscosity fuels, the fuel temperature
at the engine inlet may not exceed 135°C however.
The power of the heater is to be controlled by a viscosimeter. The set-point of the viscosimeter
shall be somewhat lower than the required viscosity at the injection pumps to compensate
for heat losses in the pipes. A thermostat should be fitted as a backup to the viscosity control.
To avoid cracking of the fuel the surface temperature in the heater must not be too high. The
heat transfer rate in relation to the surface area must not exceed 1.5 W/cm
2
.
The required heater capacity can be estimated with the following formula:
6-22
Wärtsilä 31 Product Guide - a1 - 18 October 2016
Wärtsilä 31 Product Guide
6. Fuel Oil System
Summary of Contents for 31
Page 1: ...PRODUCT GUIDE W rtsil 31...
Page 6: ...This page intentionally left blank...
Page 10: ...This page intentionally left blank...
Page 30: ...This page intentionally left blank...
Page 36: ...This page intentionally left blank...
Page 44: ...This page intentionally left blank...
Page 88: ...This page intentionally left blank...
Page 116: ...This page intentionally left blank...
Page 134: ...This page intentionally left blank...
Page 138: ...14 4 W rtsil 31 Product Guide a1 18 October 2016 W rtsil 31 Product Guide 14 Foundation...
Page 140: ...14 6 W rtsil 31 Product Guide a1 18 October 2016 W rtsil 31 Product Guide 14 Foundation...
Page 148: ...This page intentionally left blank...
Page 150: ...This page intentionally left blank...
Page 154: ...This page intentionally left blank...
Page 160: ...This page intentionally left blank...
Page 162: ...This page intentionally left blank...
Page 165: ......
Page 166: ......
Page 167: ......