8
STEP 3:
Purge the Air
Place the unit in the water,
keeping the debris intake below the water line.
Water line
Intake
For Regular Maintenance:
the vacuuming
process should last less than 30 seconds
after the air has been purged.
For Heavy Debris Collection:
the
vacuuming process may take more than 30
seconds after the air has been purged.
STEP 2:
Start the Unit
Turn the unit on by pressing the Red Button located near the Debris Chamber. You will hear the
motor turn on, which is how you know it is charged and ready for use.
Rotate the unit in the water for about 10-15 seconds for the debris chamber to purge air.
Purging all the air out of the debris chamber is what creates maximum suction.
Important:
During this step, the unit will have
minimal suction until all the air is purged. After
about 10-15 seconds of air purging, the product will
automatically begin to vacuum the debris at full power.