background image

 

 www.wateranywhere.com     (760) 727-1652     sales@wateranywhere.com 

 

Manual for Installation, Operation and Maintenance of 

6 Stage Point of Use RO & UV 

Drinking Water System with Pump

 

Document ID #: AAAROPUVW 

Revision:  05/13/20 

 
 

 

 
 
 
 
 
 

 

AAA-RO50PUVW 

AAA-RO100PUVW

Summary of Contents for AAA-RO50PUVW

Page 1: ...om 760 727 1652 sales wateranywhere com Manual for Installation Operation and Maintenance of 6 Stage Point of Use RO UV Drinking Water System with Pump Document ID AAAROPUVW Revision 05 13 20 AAA RO50...

Page 2: ...he RO membrane the heart of the RO system substantially reduces the total dissolved solids TDS from the water including arsenic barium cadmium chromium hexavalent chromium trivalent copper turbidity f...

Page 3: ...ifold 5 Prepare Tubing 6 Quick Connect Fittings and Tubing Connections 6 Step 1 Drill a Hole into the Sink for the Faucet 7 Step 2 Faucet Installation 8 Step 3 Drain Saddle Installation 9 Step 4 Syste...

Page 4: ...e of a water softener for hard water supplies will increase membrane life and efficiency Warnings Only use this system on potable water supplies Do not use this system where the water is microbiologic...

Page 5: ...ng D Housing with the RO Membrane E Tank Shut Off Valve F Four way Valve G In Line Cartridge with Activated Carbon H Flow Restrictor I Tank Valve J Tank K UV System L Faucet 1 Clean Water Outlet 2 Pol...

Page 6: ...pplies UV Controller should be mounted to the wall see System Mounting section Determine the location of the cold water feed line to use for the system supply Notice Accidentally hooking up the system...

Page 7: ...ings and Tubing Connections To ensure a secure seal using quick connect fittings Cut tubing with the end square An angled cut or distortion of the tubing will not provide an efficient seal and may cau...

Page 8: ...t surface at least 2 in diameter Check the underside of the location for interference The standard faucet that is supplied with the system requires a diameter hole The optional air gap faucet requires...

Page 9: ...p or sink top and let it rest on the sink top From the underside of the sink slide the washers onto the threaded stem as shown in the diagram 4 5 made of rubber 6 made of metal Secure the assembly by...

Page 10: ...e Starting with the drill bit drill a hole in the drain pipe Use the drill bit to enlarge the hole Clean the debris from the pipe and the hole before continuing Notice Take extreme caution to not dril...

Page 11: ...on the sink faucet to drain water and relieve pressure from the lines Assemble the Ball Valve Adapter Kit Use Teflon tape to wrap the threads of the ball valve approximately 3 wraps Screw the ball val...

Page 12: ...re that all tubing and fittings used for RO product water are poly material and not copper Due to RO product water being very pure it can leach the minerals from copper tubing which will cause a metal...

Page 13: ...should illuminate without any alarms Wait 5 minutes for UV lamp to reach full power Slowly turn the feed valve counterclockwise until fully open the handle should be in line with the tubing as it ent...

Page 14: ...L Replace every 12 months Quartz Sleev Model QS 212 Replace as needed during lamp change Part Image 8851 2J03 B423 Booster Pump TACS 114 48 Pump Power Supply PSW240 Shut Off Switch LPS340G Low Pressur...

Page 15: ...tions All pre and post filters should be replaced every 3 6 months Before starting shut off cold water supply to unit and unplug the UV system Lift the handle on the faucet to drain out the storage ta...

Page 16: ...V lamp in upward direction from the UV chamber and lamp connector base Hold the UV lamp at the ceramic ends Insert the new UV lamp fully into the UV chamber leaving about two inches of the UV lamp pro...

Page 17: ...with a cloth soaked in CLR vinegar or some other mild acid and then rinse with water Note If sleeve cannot be completely cleaned or it is scratched or cracked then replace the sleeve Reinstall the qu...

Page 18: ...oap Pour about teaspoon of Hydrogen Peroxide or household bleach into each filter housing and replace housings on the RO system Open the feed water valve and open the RO faucet until water flows freel...

Page 19: ...ed in your unit is rated at 77 F and 60psi Water production will decrease approximately 1 5 for each degree that your incoming water is below 77 F It may be necessary to change to a higher flow membra...

Page 20: ...his system contains a UV Lamp Do not operate the UV Lamp when it is removed from the chamber Unintended use or damage of the system may result in the exposure of dangerous UV radiation UV radiation ma...

Page 21: ...min If these parameters are not being met please check the following Is the system receiving adequate feed water The pump s inlet chamber must be flooded to prevent performance robbing air ingestion...

Page 22: ...____________________________________________________________ ____________________________________________________________ ____________________________________________________________ _________________...

Page 23: ...not be liable for damages or delay caused by defective material Products returned to SELLER for warranty examination must be shipped freight prepaid SELLER S Liability SELLER SHALL NOT BE LIABLE FOR...

Page 24: ...ent Prefilter Stage 1 2 H F2510AC Carbon Block Pre filters Stages 2 3 1 H F1032 43A Carbon Post Filter Stage 5 with QC adapters RFK 5 PRE Pre Filter Pack Membrane Sold Separately Includes 1 H F1005CF...

Reviews: