Section 2 – Installation
7
Section 2. – Installation
The
Chemflo
is supplied with an installation guide. Installers should refer to this guide.
2.1 Plan the installation
Ensure that…
1. The
Chemflo
controller is installed in a sheltered location.
2. The
Chemflo
controller is close enough to the expected location of the Probe / Injection Tee
for the Probe cable and pump output tubing to reach without straining.
3. The maximum suction height from the bottom of the chemical drums to the dosing pumps is 2
metres.
4. The mains power lead from the pool pump reaches the
Chemflo
without straining.
5. The mains power lead from the
Chemflo
reaches a mains power outlet. If the controller is
mounted in a wet area, a weatherproof power outlet must be used. It is recommended that you
use an earth leakage circuit breaker with this power outlet. Please consult a qualified
electrician if you are not sure if this is fitted.
2.2 Install the Probe and Injection Tee
Install the Probe and Injection Tee as per the diagrams below. Use a suitable PVC joining
compound. The Tee is installed in the return line to the pool, as the pressure is low and the Probe
will only be exposed to clean, filtered water.