Emerald Gas Insert Zero Clearance Kit
7
Right Side
Base
Section
screw
screw
Left Side
Base
Section
screw
screw
Do not install the third screw until
the back panel is installed.
INSTALLATION
FRAMING
1)
The cabinet face panels have a 1/2" lip to define the zones for combustible
and non-combustible facing materials: outside the lip, any material up
to 1/2" (13mm) may be used; inside the lip, only non-combustible
materials may be used (with a maximum thickness of 1-1/2" (38mm)).
The kit may be installed directly on and/or against standard combustible
building materials.
2)
Frame in the enclosure for the Kit with framing material. The framed
opening for the assembled kit is 52" (1321 mm) high x 50-1/4" (1276 mm)
wide x 18-1/2" (470 mm) deep. See diagram.
If the interior of the cabinet framing is finished (with sheet rock,
for example), The dimensions given are from the inside of the
finished surfaces. The ceiling inside the framed enclosure
should be a minimum of 55-1/2" (1410mm) from the base of
the plinth.
3)
For exterior walls, use a vapour barrier and insulate the
enclosure to the same degree as the rest of the house, or
according to local installation codes. In colder climates, if the heater is to be installed against an exterior wall or
chase, insulate the exterior walls according to local installation codes.
ZERO CLEARANCE KIT ASSEMBLY
Parts Included with Kit:
2 Back sections
2 Side
1 Base
1 Top
2 Front Face Side Panel
1 Front Face Top Panel
2 Top Standoffs
2 Extension Legs
1 Plinth
All pieces join together using the sheet metal screws that are
provided with the kit.
Assemble the Cabinet
1)
Assemble the Sides and Base sections. The Side sec-
tions fit inside the lip of the Base section. The wider flange
on the Side section is on the front of the kit.
Secure with 2 screws on each side. Leave the 3rd screw
(closest to the rear) until the Back section is attached.
Summary of Contents for E61
Page 16: ...Printed in Canada...