Emerald Gas Insert Zero Clearance Kit
9
5)
Assemble the 2 top Standoffs. The Top Standoffs are
shipped flat and must be folded at the bend lines into the
correct shape.
Attach the Right Standoff to the top using the 4 holes at the
front right of the top. Install the Left Standoff to the 4 holes
at the front left.
6)
Assemble the flue adaptor box. Slide the flex vent pipe
over the small vent opening on the base of the adaptor box
and secure with a clamp. Repeat for the 2nd flex vent pipe.
Use silicone to seal the connection.
Left and Right Standoffs in position and
attached with 4 screws each.
Secure with 6 screws on the back. Leave the top screw
holes until the top is attached.
4)
Install the Top. Hold the top so that the large vertical flange
is at the front of the cabinet and fit it down over the Side/
Back assembly. Secure the top to the assembly using 3
screws on each side and 5 through the back and 8 on top.
INSTALLATION
Summary of Contents for E61
Page 16: ...Printed in Canada...