20
TRUCLIMATE 500 INSTALLATION GUIDE
Chiller Installation: Removing Module from Bank of Units
1.
Undo the 2.5” groove couplings, disconnect all 3-way valve harnesses and isolation valve harnesses.
2. Slightly lift (2in maximum) the module and pull away from the bank. Make sure that the module sensors does not
come into contact with any of the structural members of the header rack.
3. Reassemble in the reverse order. Connect the all 3-way valves harnesses sand isolation valve harnesses by
following the provided labels. Prior to re-starting the system verify that all valves are wired properly by manually
changing the header rack modes and observing the 3-way valve orientation.