29
WC SERIES VARIABLE SPEED DUAL SCREW CHILLER INSTALLATION MANUAL
Chiller Start-up Report cont.
CONTROLS CHECKS
INSPECTION ITEM
RESULT
INITIALS
POWER ON INTERFACE AND ENSURE ALL PAGES
AND DATA IS READING NORMALLY
OK
|
NG
VERIFY USER MANAGEMENT IS SETUP PROPERLY
(ENHANCED CONTROLS ONLY)
OK
|
NG
VERIFY WATER TEMPERATURES CLOSELY MATCH
REFRIGERANT SAT. TEMPERATURES
OK
|
NG
VERIFY COMPRESSOR AND UNIT SETTINGS ARE
CORRECT (SEE SHEET BELOW)
OK
|
NG
COMPUTER STATIC IP ADDRESS (IF APPLICABLE)
(FACTORY: 10.1.20.50)
VERIFY BAS IS COMMUNICATING WITH UNIT PROPERLY
OK
|
NG
VERIFY REMOTE ACCESS WORKS PROPERLY
(IF APPLICABLE)
OK
|
NG
Notes:
COMPUTER STATIC IP ADDRESS (IF APPLICABLE)
(FACTORY: 10.1.7.49)
VERIFY DDC IS COMMUNICATING WITH UNIT
PROPERLY
Summary of Contents for WC Series
Page 2: ......