The Cube Technical Manual - Version 1, May 2014
10
11
1.
Remove packing straps and unpack unit and visually inspect for any damage.
(Report any defects to Waterlogic as soon as possible).
2.
Place the unit on a suitable work bench.
3.
Open the top cover by removing the two screws that fix it in place.
4.
Visually inspect all electrical connections and power lead.
5.
Visually inspect all water connections.
6.
Remove the three screws on top of the Firewall Chamber; you may need to
remove some of the screws holding the top shelf in place to gain access to the
Chamber. Inspect the quartz spiral for damage and re-assemble.
7.
Connect to a potable drinking water supply via a 1/4” John Guest tube, the supply
must be limited to 3bar.
8.
Connect the power cord to an appropriate power supply and the machine.
9.
Replace the top cover and re-fit the screws.
10.
Note that the hot tank must be filled before any other tank.
11.
Select the hot button and then the dispense button until water flows clearly, you
must dispense at least 200ml of water using the hot option for the tank to begin
heating the water.
12.
Select the cold button and then the dispense button until water flows clearly.
13.
After cold/hot has filled, turn on heater/compressor switch allow up to an hour
for the unit to heat and chill. Test water temperatures and ensure the water tastes
acceptable.
14.
Check all of the functions of the Cube.
15.
Turn off the power and water.
16.
Turn unit around and drain from rear drain valves if fitted.
17.
Clean and repack ready for dispatch.
18.
Waterlogic recommend that all units are fully electrically (PAT) tested on site by
the commissioning engineer as damage may have occurred during transit to the
unit’s final destination.
Installation Procedures
1.
Mount the Cube on a firm, level surface so the machine cannot topple or fall
over. A 50mm air gap is required the whole way around the machine to allow for
sufficient ventilation. The Cube must not be installed in direct sunlight, adjacent to a
heat source, or in an ambient room where the temperature is above 30°C or below
5°C.
2.
It is advisable that the power and water supply be within a 2 metre range of
the machine, the isolation for the water and electricity should be easily accessible.
The supply of water must be from a potable source and the machine should not be
installed using an extension lead.
3
. Make the water connection to the Cube via a length of ¼” flexible pipe; with
the pressure reducing valve that has been supplied installed 20cm away from the
machine before the connection into the back of the machine is made. This will
bring the pressure down to the ideal working pressure of 3bar. Minimum operating
pressure for the machine to work suitably is 2.6bar. The minimum incoming flow rate
is 1.2 litres per minute. At pressures higher than 3.2bar the machine will not function
correctly and this can lead to leaks. The water should be from a potable source and
should be allowed to run clear of any sediment before making the connection to the
Cube.
4.
Check the wall socket (polarity) and then make the electrical connection to the
Cube by plugging the power lead in to the socket at the rear of the machine. Then
connect it to the electrical feed or wall power outlet. Turn on the power supply to
the Cube.
5.
Turn on the red switch at the back of the Cube, the machine will now run through
a self test cycle. Once the self test cycle has completed the filter(s) will need to be
flushed.
6.
Select the ambient water icon and then the central dispense button and dispense
10 liters of water. This will remove excess carbon fines and sufficiently generate the
filter.
Pre Delivery
Inspection Procedures (PDI)