The Cube Technical Manual - Version 1, May 2014

12

13

7.

  The hot water tank now needs to be filled, this is done by selecting the hot water 

icon, then followed immediately by pressing and holding the main dispense button 

until the tank has completely filled and water is being dispensed. Flush through 5 

litres of water by continuing to select the hot option. Then repeat this process again 

for the cold option.

8.

  After making sure the hot tank is full of water then turn on the green heater and 

compressor switch at the rear of the machine. 

9.

  Select the hot icon, then select and hold the main dispense button immediately 

after selecting the hot icon.

10.

 Dispense at least 200ml of hot water.

11.

 The machine will now begin to heat / chill the water.

12.

 The water temperatures are pre-set at the factory to 5°c for the cold water and 

87°c for the hot water.

13.

 The water should now be taste tested, any hint of taste in the water means 

the machine needs to be flushed further with an additional 10 litres and then taste 

tested again.

14.

 The Cube should be sanitized at installation.

INSTALLATION KIT

The Cube must be installed according to the local guidelines and it is advised that 

an installation kit be used. A pressure reducing valve is supplied with the Cube and 

must be installed 20cm away from the back of the machine as part of the installation; 

the pressure reducing valve is set to 2.8 bar. 

• The Cube should not be connected to water supplies of unknown bacterial quality

  or those not already fit for human consumption. The Cube should only be connected

  to a Potable drinking water supply.

• The filter on the Cube must be changed every 12 months.

• The UV lamp on the Cube must be changed every 12 months.

• The cold tank should also be flushed and sanitised every 12 months.

• Waterlogic International strongly recommends the use of an anti-flood device.

• Figure 1 is the recommended installation kit.

Fig 1. Waterlogic 

Installation Kit

1 - 15mm Compression Inlet

2 - Double Check Valve (great for carbonated water)

3 - Adjustable Pressure Reducing Valve

4 - Integral Isolator

5 - Pressure Gauge Port

6 - Waterblock

7 - 1/4” Pushfit Outlet

NOTE:

 Should the incoming power to the Cube become interrupted users will 

need to follow points 8-12 for water to be dispensed. (This is machine dependent).

Summary of Contents for WL Cube Firewall

Page 1: ...WL Cube Firewall Technical Manual VERSION 1...

Page 2: ...10 The appliance is to be supplied through a residual current device RCD having a rated residual operating current not exceeding 30mA 11 This appliance is intended to be used in household and similar...

Page 3: ...any kinds of different filter combinations available from Waterlogic to suit local water conditions FIREWALL CHAMBER The Firewall chamber incorporates the in Faucet UV and is made of aluminium and is...

Page 4: ...the quartz spiral cleaned by using an ultrasonic bath if needed PCB The PCB Printed Circuit Board is the control unit for the Cube it is responsible for the functions of all the mechanical and electri...

Page 5: ...a trip hazard Keep them off the floor Take care not to allow the power lead to get wet If the lead gets wet it must not be used The Cube Technical Manual Version 1 May 2014 WL Cube Flow Diagram Cold...

Page 6: ...rocedures 1 Mount the Cube on a firm level surface so the machine cannot topple or fall over A 50mm air gap is required the whole way around the machine to allow for sufficient ventilation The Cube mu...

Page 7: ...The Cube should be sanitized at installation INSTALLATION KIT The Cube must be installed according to the local guidelines and it is advised that an installation kit be used A pressure reducing valve...

Page 8: ...Always place cup mug in the centre of the drip tray Always use a ceramic cup or a cup suitable for use with hot water Do not hold cup or place hands in dispensing area whilst dispensing water Do not...

Page 9: ...if there is any visible remove the loom and replace with a new one 9 Reconnect and replace the UV lamp assembly making sure not to touch the new UV lamp with bare hands as this will shorten the life...

Page 10: ...16 The machine will now begin to heat chill the water 17 Inspect the faucet nipple and clean or replace if it is damaged or if there any calcium built up around it 18 Using the antibacterial wipes su...

Page 11: ...panels of the machine including the drip tray and grill ADVISORY ICONS HOT WATER Press and hold the hot water icon for 3 seconds until the icon has illuminated orange select the dispense button and ho...

Page 12: ...rrectly and being turned on and off when you select the cold option 5 There is cold water flow but hot water is not flowing This may be due to calcium build up in the hot tank or the hot water outlet...

Page 13: ...t and continual improvement and therefore reserves the right to change specifications without prior notice other than in the case of significant changes Description Cube 120V HCA Cube 230V HCA Machine...

Page 14: ...into the surface of our products giving them built in sustainable antimicrobial protection BioCote s silver technology has been tested by an independent laboratory to show its ability to inhibit the g...

Page 15: ...rsion 1 May 2014 28 29 Electrical Wiring Diagram 230V Dip Switch Setup DANGER HIGH VOLTAGES PRESENT ON THIS PCB CARE MUST BE TAKEN WHEN LIVE TESTING THE CUBE MAIN PCB DIP SWITCHES 1 2 WITH INSTRUCTION...

Page 16: ...ERATURE SETTING Cold water temp range 5 c 10 c 15 c When reading this document please note the white coloring on the diagrams indicate the required position of the switch to determine the setting UV 1...

Page 17: ...Blue O D 1 4 13 JG Equal Tee Connector 1 4 14 JG Equal Elbow Connector 1 4 15 JG LLD PE Tube Blue O D 1 4 16 Solenoid Valve 24 DC Single Spring Load 17 JG Stem Elbow Connector 1 4 1 4 18 Drain valve...

Page 18: ...nector 1 4 36 JG LLD PE Tube Blue O D 1 4 37 JG LLD PE Tube Blue O D 1 4 38 Solenoid Valve 24 DC Single Spring Load 39 JG Equal Tee Connector 1 4 40 JG Stem Elbow Connector 1 4 1 4 41 JG Equal Tee Con...

Page 19: ...stem Elbow connector 15 Solenoid Valve 24 DC Single Spring Load 16 Cube cold tank 1 4 Litre 17 Compressor 18 Domestic Filter Dryer Chinese 19 WL Cube Side panel right Silver 20 BulkHead Fitting 1 4 x...

Page 20: ...use WL Label 37 Hot Cold Solenoid Valve 24V 300mm CUBE 38 1 4 Equal Tee Connector ST 39 UV 15 W Electronic Ballast Ver 3 40 Power Transformer 41 WL Cube Electronics cover Black 42 WL Cube UI Label WL...

Page 21: ...eacon Court Sandyford Dublin 18 Ireland www waterlogic com Waterlogic USA 11710 Stonegate Circle Omaha NE 68164 Speak to a Water Expert Rest of the world exportsales waterlogic com 353 1 293 1960 USA...