4.
Insert the new UV Lamp while holding the white end
caps only.
Insert the UV Lamp, ensuring you have pushed it all the
way down until it cannot go any further.
Reconnect the UV lamp connector, making sure the
connectors are lined up correctly as they will only fit
when correctly aligned.
5.
Reinstall the UV Lamp Protective Cover and Secure it in
place with the fixing screw.
6.
Install the Top Cover onto the machine by placing cover
into position. Ensure the two fixing logs at the front are
lined up with the grooves (#1) then pulling the cover
firmly towards yourself until it clicks into place (#2)
7.
Reconnect the power lead into the back of the machine
and plug in to power source.
8.
Visually verify that the UV Lamp is working correctly by
checking the PCB LED. There should be no warning icons
flashing.
9.
Turn on Red Power Switch to the On Position
I = On
10.
Visually verify that the UV Lamp is working correctly by
checking the PCB LED. There should be no warning icons
flashing.
CUBE
Operating, Installation, and Service Manual
Page 65 - Revision: 6-23-2015