WL350 Operating, Installation, and Service Manual Page 45 – Revision 8-30-2016
19.
Connect power to WL350 Water Treatment System.
Compressor Test
20.
Red Heater & Compressor to be in the on position I=ON. Always ensure tanks are
full of water before turning on the heater or the overload (high limit) will open and
require manual reset. If the wire condenser at back of the unit is warm, the
refrigeration system is working. I=ON
21.
Once the WL350 Water Treatment System reaches its target temperature, the compressor will
shut off. Draw a glass of cold water and verify it is has chilled to proper temperature.
Heater Test
22.
Always ensure tanks are full of water before turning on the Heater or the Overload (High Limit)
will open and require manual reset. It will take the heater approximately 10 minutes to heat the
water from ambient 24°C (75°F) to the factory set point of 87°C (187°F). Dispense a cup of hot
water to ensure the temperature/odor/taste is acceptable.
WARNING!
HOT WATER CAN BURN OR SCALD. The WL350 Water Treatment System
produces Hot Water up to 87°C (187°F). Water above 52°C (125°F) can cause severe burns or
scalding. Hot water should be dispensed carefully into insulated container to avoid injury.