Start the system
To start the Prep 150 LC system and prepare it for operation, follow this proced-
ure in conjunction with Good Laboratory Practice (GLP) guidelines and your labor-
atory's standard operating procedures.
Starting sequence:
To start the system and prepare it for operation:
1. Power-on the individual system modules by actuating the power switch on
each system module.
Important:
If you are using the optional Prep Degasser with the 2545 QGM,
ensure the degasser is operating.
2. Power-on the ChromScope PC workstation.
Requirement:
You must wait at least 30 seconds after powering-on the last
module before you start the ChromScope software and Waters Instrument
Console. Doing so is necessary for the components to communicate properly
with the software during startup.
3. From the Windows desktop, double-click the ChromScope shortcut .
Alternative:
From the Windows Start menu, click All Programs, and click
ChromScope.
10
August 8, 2014, 715003940 Rev. B
Prep 150 LC System