5-98
Maintenance Procedures
Replacing the IntelliStart Fluidics tubing
In the event of a blockage in the tubing connections between the IntelliStart
Fluidics system components, you must replace the tubing. These procedures
explain how to replace the tubing for the LockSpray and sample delivery
systems. However, they exclude probe connections, which vary according to
your application. For probe connection instructions, see
for the relevant procedure:
•
For the ESI probe, see
“Installing the ESI probe” on page 3-2
.
•
For the APCI probe, see
“Installing the APCI probe” on page 3-14
.
The IntelliStart Fluidics system layout
(Tubing connections omitted for clarity.)
A
B
C
A
B
C
A
B
C
Waters
A
B
C
Lock-spray selector valve
Sample selector valve
Diverter valve
Sample pump
Lock-spray pump
Sample vials
(A, B, and C)
Tubing guides
Flow sensor
Grounded union
Access doors
Summary of Contents for SYNAPT G2
Page 18: ...xviii Table of Contents...
Page 46: ...2 8 Starting Up and Shutting Down the Mass Spectrometer...
Page 66: ...3 20 Configuring the LockSpray Source...
Page 228: ...B 24 External Connections 7 Click Next Result The software installs 8 Click Finish...
Page 232: ...C 4 Materials of construction and compliant solvents...