Connecting the liquid waste line
B-13
Connecting the liquid waste line
Required materials
•
Chemical-resistant, powder-free gloves
•
Waste container
To connect the liquid waste line
1. Place a suitable waste container below the mass spectrometer.
2. Slide a drain line over the barbed fitting of the drain (located at the
left-hand side of the mass spectrometer).
Warning:
The waste line and connection can be contaminated with
biologically hazardous materials. Always wear chemical-resistant,
powder-free gloves while performing this procedure.
Drain line
Summary of Contents for SYNAPT G2
Page 18: ...xviii Table of Contents...
Page 46: ...2 8 Starting Up and Shutting Down the Mass Spectrometer...
Page 66: ...3 20 Configuring the LockSpray Source...
Page 228: ...B 24 External Connections 7 Click Next Result The software installs 8 Click Finish...
Page 232: ...C 4 Materials of construction and compliant solvents...