TM 11-5825-278-12-2
APPENDIX C
COMPONENTS OF END ITEM AND BASIC
ISSUE ITEMS LIST
Section I. INTRODUCTION
C-1. Scope
This appendix lists the components of end item and basic issue items for the direction finder set
to help you inventory items required for safe and efficient operation.
C-2. General
The Components of End Item and Basic Issue Items Lists are divided into the following sections:
a. Section II - Components of End Item. This listing is for informational purposes only,
and is not authority to requisition replacements. These items are part of the end item, but are
removed and separately packaged for transportation or shipment. As part of the end item,
these items must be with the end item whenever it is issued or transferred between property
accounts.
b. Section III - Basic Issue Items. These are the minimum essential items required to
place the direction finder set in operation, to operate it and to perform emergency repairs.
Although shipped separately packaged, basic issue items must be with the direction finder set
during operation and whenever it is transferred between property accounts. This manual is your
authority to request/requisition
authorization of the end item.
C-3. Explanation of Columns
replacement basic issue items, based on TOE/MTOE
The following provides an explanation of columns found in the tabular listings:
a. Column 1- National Stock Number. This column indicates the national stock number
assigned to the item and will be used for requisitioning purposes.
b. Column 2- Description, FSCM and Part Number. This column indicates the federal
item name and, when applicable, a brief description to identify and locate the item. The last
line for each item indicates the FSCM (in parentheses) followed by the part number.
c. Column 3- Unit of Measure (O/M). This column indicates the measure used in
performing the actual operation/maintenance function. This measurement is expressed by a
two-character alphabetical abbreviation.
d. Column 4- Quantity Required (Qty Rqd). This column indicates the quantity of the
item authorized to be used with/on the equipment.
C-1
Summary of Contents for AN/PRD-11
Page 2: ......
Page 6: ......
Page 10: ...TM 11 5825 278 12 2 RADIO RECEIVER DIRECTION FINDER SET AN PRD 11 1 0...
Page 18: ......
Page 21: ...1 13 LOCATION AND TM DESCRIPTION OF MAJOR COMPONENTS 11 5825 278 12 2 Continued 1 11...
Page 23: ...TM 11 5825 278 12 2 1 13 LOCATION AND DESCRIPTION OF MAJOR COMPONENTS Continued 1 13...
Page 32: ...TM 11 5825 278 12 2 2 2 RECEIVER CONTROLS INDICATORS AND CONNECTORS 2 2...
Page 33: ...TM 11 5825 278 12 2 2 2 RECEIVER CONTROLS INDICATORS AND CONNECTORS Continued 2 3...
Page 34: ...TM 11 5825 278 12 2 2 2 RECEIVER CONTROLS INDICATORS AND CONNECTORS Continued 2 4...
Page 35: ...TM 11 5825 278 12 2 2 2 RECEIVER CONTROLS INDICATORS AND CONNECTORS Continued 2 5...
Page 36: ...TM 11 5825 278 12 2 2 3 DF PROCESSOR CONTROLS INDICATORS AND CONNECTORS 2 6...
Page 37: ...TM 11 5825 278 12 2 2 3 DF PROCESSOR CONTROLS INDICATORS AND CONNECTORS Continued 2 7...
Page 38: ...TM 11 5825 278 12 2 2 3 DF PROCESSOR CONTROLS INDICATORS AND CONNECTORS Continued 2 8...
Page 39: ...TM 11 5825 278 12 2 2 4 SIGNAL MONITOR CONTROLS INDICATORS AND CONNECTORS 2 9...
Page 40: ...TM 11 5825 278 12 2 2 4 SIGNAL MONITOR CONTROLS INDICATORS AND CONNECTORS Continued 2 10...
Page 41: ...TM 11 5825 278 12 2 2 4 SIGNAL MONITOR CONTROLS INDICATORS AND CONNECTORS Continued 2 11...
Page 42: ...TM 11 5825 278 12 2 2 5 ANTENNA CONNECTORS AND INDICATOR 2 12...
Page 46: ...TM 11 5825 278 12 2 2 9 SITE SELECTION Continued 2 16...
Page 48: ...TM 11 5825 278 12 2 2 9 SITE SELECTION Continued 2 18...
Page 100: ......
Page 107: ...TM 11 5825 278 12 2 2 11 INITIAL ADJUSTMENTS Continued GO ON TO SHEET 3 2 77...
Page 115: ...TM 11 5825 278 12 2 2 12 OPERATING PROCEDURES Continued GO ON TO SHEET 3 2 85...
Page 121: ...TM 11 5825 278 12 2 2 12 OPERATING PROCEDURES Continued 2 91...
Page 123: ...TM 11 5825 278 12 2 2 12 OPERATING PROCEDURES Continued 2 93...
Page 127: ...TM 11 5825 278 12 2 2 12 OPERATING PROCEDURES Continued 2 97...
Page 129: ...TM 11 5825 278 12 2 2 12 OPERATING PROCEDURES Continued GO ON TO SHEET 2 2 99...
Page 184: ......
Page 204: ...2 10 2 11a 4 11a TM 11 5825 278 12 2 4 9 TROUBLESHOOTING PROCEDURES Continued k 4 20...
Page 248: ...TM 11 5825 278 12 2 4 11 d MAINTENANCE PROCEDURES Continued 4 64...
Page 251: ...TM 11 5825 278 12 2 4 13 PACKING INSTRUCTIONS Continued 4 67...
Page 254: ......
Page 260: ...TM 11 5825 278 12 2 B 4 Section II MAINTENANCE ALLOCATION CHART...
Page 261: ...TM 11 5825 278 12 2 Section II MAINTENANCE ALLOCATION CHART Continued B 5...
Page 262: ...TM 11 5825 278 12 2 Section II MAINTENANCE ALLOCATION CHART Continued B 6...
Page 263: ...TM 11 5825 278 12 2 Section II MAINTENANCE ALLOCATION CHART Continued B 7...
Page 264: ...TM 11 5825 278 12 2 Section II MAINTENANCE ALLOCATION CHART Continued B 8...
Page 265: ...TM 11 5825 278 12 2 Section II MAINTENANCE ALLOCATION CHART Continued B 9...
Page 266: ...TM 11 5825 278 12 2 Section II MAINTENANCE ALLOCATION CHART Continued B 10...
Page 267: ...TM 11 5825 278 12 2 Section III TOOL AND TEST EQUIPMENT REQUIREMENTS B 11...
Page 268: ...TM 11 5825 278 12 2 Section III TOOL AND TEST EQUIPMENT REQUIREMENTS Continued B 12...
Page 269: ...TM 11 5825 278 12 2 Section IV REMARKS B 13...
Page 270: ...TM 11 5825 278 12 2 Section IV REMARKS Continued B 14...
Page 272: ...TM 11 5825 278 12 2 Section II COMPONENTS OF END ITEM AND BASIC ISSUE ITEMS LIST C 2...
Page 273: ...TM 11 5825 276 12 2 Section III BASIC ISSUE ITEMS C 3 C 4 blank...
Page 274: ...I...
Page 276: ...TM 11 5825 278 12 2 Section II ADDITIONAL AUTHORIZATION LIST D 2...
Page 278: ...TM 11 5825 278 12 2 Section II EXPENDABLE SUPPLIES AND MATERIALS LIST E 2...
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 296: ......
Page 297: ......
Page 298: ...059582...