PPC-2000 User’s Guide
Chapter 2: Hardware Installation
Doc.# 30002-00 Rev 2.3
Watlow Anafaze
27
DIN Rail Mounting
1.
Each module in the assembly has a DIN rail latch. Pull all
the latches to the open position. See
Figure 2.11 DIN Rail Latches
2.
Place the module assembly on the upper lip of the DIN
rail; push the lower side of the assembly over the lower lip
of the DIN rail. See
Figure 2.12 Mounting Assembled PPC
Modules on a DIN rail (side)
3.
Push the DIN rail latches up and under the lower lip of the
DIN rail.
DIN Rail Latch
(open)
DIN Rail Latch
(closed)
DIN Rail Latch
(open)
Upper lip of
DIN Rail
Push to lock
Summary of Contents for Anafaze PPC-2000
Page 2: ......
Page 14: ...Table of Contents PPC 2000 User s Guide viii Watlow Anafaze Doc 30002 00 Rev 2 3...
Page 24: ...List of Tables PPC User s Guide xviii Watlow Anafaze Doc 30002 00 Rev 2 3...
Page 36: ...Chapter 1 Overview PPC 2000 User s Guide 12 Watlow Anafaze Doc 30002 00 Rev 2 3...
Page 112: ...Chapter 2 Hardware Installation PPC 2000 User s Guide 88 Watlow Anafaze Doc 30002 00 Rev 2 3...
Page 184: ...Chapter 4 Troubleshooting PPC 2000 User s Guide 158 Watlow Anafaze Doc 30002 00 Rev 2 3...
Page 296: ...Chapter 7 Specifications PPC 2000 User s Guide 268 Watlow Anafaze Doc 30002 00 Rev 2 3...
Page 310: ...Appendix A Modbus Protocol PPC 2000 User s Guide 282 Watlow Anafaze Doc 30002 00 Rev 2 3...
Page 311: ...Doc 30002 00 Rev 2 3 Watlow Anafaze 283 B Appendix B Declaration of Conformity...
Page 319: ...PPC 2000 User s Guide Glossary Doc 30002 00 Rev 2 3 Watlow Anafaze 291...
Page 320: ...Glossary PPC 2000 User s Guide 292 Watlow Anafaze Doc 30002 00 Rev 2 3...