3
When you unpack your pump
3.1
Unpacking your pump
Unpack all parts carefully, retaining the packaging until you are sure all components are present and in
good order. Check against the components supplied list, below.
3.2
Packaging disposal
Dispose of packaging materials safely, and in accordance with regulations in your area. The outer carton
is made of corrugated cardboard and can be recycled.
3.3
Inspection
Check that all components are present. Inspect components for damage in transit. If anything is missing
or damaged, contact your distributor immediately.
3.4
Components supplied
630 Components
l
630 pump drive unit, fitted with pumphead if specified as a pump
l
The designated power cable (attached to the pump drive unit)
l
A 630N module providing pump ingress protection to IP66, NEMA 4X. if a DuN.
l
Note:
the module is attached for transit, but must be removed to allow wiring up, voltage selection
and fuse inspection and then re-affixed before the pump is operated.
l
Product safety information booklet incorporating quick start manual
3.5
Storage
This product has an extended shelf life. However, care should be taken after storage to ensure that all
parts function correctly. Please observe the storage recommendations and use-by dates which apply to
tubing you may wish to bring into service after storage.
m-630dun-en-08.2
7
Summary of Contents for 630 Du
Page 81: ...m 630dun en 08 2 81 ...