Notes:
FILENAME
DATE:
B. CREWS
DESCRIPTION:
PAGE
DRAWN BY:
Static Pressure Pickup Tube
1
JOB NAME
04/29/02
G-SPUTUBE1.CDR
OE290
In Order To Obtain Accurate Static Pressure Readings
The Static pressure Pickup Probe Should Be Mounted
Per The Following Recommendations:
1.)The Probe Should Be Mounted In a Straight Section
Of Ductwork Approx. 2/3 The Length Of the Supply Duct,
Downstream Of The HVAC Unit.
2.)The Probe Should Not Be Mounted Less Than 3 Duct
Diameters Downstream Or Not Less Than 2 Duct
Diameters Upstream Of Any Elbow or Takeoff.
See The Systems Installation And Operation Manual For
Other Design Considerations And Recommendations
Regarding Static Pressure Pickup Tube Location.
Caution!
1.)The Static Probe(OE290) Is Supplied With A 14“
Length Of Tubing For Connection To The Static
Pressure Sensor. The Static Pressure Sensor
(OE271) Is Designed To Be Mounted Adjacent To The
Location Where The Static Pickup Tube Is Mounted
And Wired Back To The Controller Board. The Static
Pressure Sensor Can Also Be Mounted Close To The
Controller Board And Tubing (By Others) Routed
From The Sensor To The Static Pickup Probe. Be
Sure Not To Kink The Tubing Between The Static
Pickup Probe And The Static Pressure Sensor.
Static Pressure Pickup Tube OE290
Mounting Plate
Gasket
Adhesive Backed Drill Guide
Mounting Template
2-3/4“
Mounting Plate
4.0"
3/4"
1/4" Hex Head Sheet Metal Screws
Thread
Together
1/8“ MPT
Threaded Pipe
Duct Work
Drill 5/16" Hole In Ductwork For Probe
1/4“ Barb Fitting
1/4“ O.D. X 3/16” I.D. x 14” Long - Fire Rated Tubing
Slide Over 1/4“ Barb Fitting
Tubing Not To Exceed 250 Ft. Length.
Do Not Splice Tubing.
Connect This End Of Tubing To “Hi”
Port Of Pressure Sensor