Checklist Before Installation
1. Water Pressure
- Not less than 20 psi constant. See page 30.
2. Double check hardness
- of water with test strips provided to verify that your appliance is right for
the job. See page 10.
3. Water Supply Flow Rate
- 5 gallons per minute is recommended as minimum.
4. Drain
- Drain appliance to fl oor drain or washer drain. To prevent back-siphoning, the installer must
provide an adequate air gap or a siphon break. See fi gure 1.
5. Electricity
- The transformer supplied is a standard 120 volt, 60 cycle A.C. for USA or 220 volt, 50
cycle A.C. for outside the USA. See fi gure 8.
6. Water Quality
- If water supply contains sulfur, bacteria, iron bacteria, tannins, algae, oil, acid, dirt,
sand or other unusual substances, special equipment must be installed prior to the appliance.
Call Our HelpLine
1-800-896-3219
Monday thru Friday 8:00am to 5:00pm EST
6
Summary of Contents for Sof-Tek
Page 2: ...2 Notes this page left blank intentionally...
Page 17: ...Setting The Controller Continued Controller Layout Figure 10 17...
Page 18: ...Parts Diagrams ELECTRONICS AND CABINET Figure 11 18...
Page 20: ...Parts Diagrams Cabinet and Assemblies Figure 12 20...
Page 24: ...Parts Diagrams I O Adapter Assembly Figure 14 24...