INSTALLATION QUICK LOOK
Please follow 4 color tubing diagram to complete installation
CAUTION: When cutting supplied tubes, predeter-
mine the length by measuring the distance between
the components to be connected.
No tools are needed to connect 4 colored tubes.
HOW TO MAKE A CONNECTION
1. CUT THE TUBE SQUARE
Cut the tube square. It is essential that the outside diameter
be free from score marks and that burrs and sharp edges be
removed before inserting into fitting. For soft thin walled plastic
tubing we recommend the use of a tube insert.
2. INSERT TUBE
Fitting grips before it seals. Ensure tube is pushed into the tube
stop.
3. PUSH UP TO TUBE STOP
Push the tube into the fitting, to the tube stop. The collet
(gripper) has stainless steel teeth which hold the tube firmly in
position while the o-ring provides a permanent leak proof seal.
4. PULL TO CHECK SECURE
Pull on the tube to check that it is secure. It is a good practice to
test the system prior to leaving site and/or before use.
Disconnecting
PUSH COLLET AND REMOVE TUBE
To disconnect, ensure the system is depressurized before
removing the tube. Push in collet squarely against face of fitting.
With the collet held in this position, the tube can be removed.
The fitting can then be re-used.
Installation needs to comply with State and local plumbing regulations.
Connections
Item No.
Color of Tubing
Description
A
RO Faucet
FU-WDF-905-CP
Blue
Pure water to the Faucet
B
Feed Water Valve
F560080 / F560070
Green
Feed Water to RO System
C
Tank Ball Valve
PSV501222W
Yellow
Pure Water to Storage Tank
D
Drain Connector
SC500B14/38
Red
Discharge Water to Drain
7