CHAPTER 4: INITIAL START-UP
Page
42
of
158
PR2: 04/22/13
Benchmark 2.0LN Dual-Fuel Low NOx Boiler
Operation and Maintenance Manual
OMM-0052_0E
GF-127
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
•
Ph: 800-526-0288
Required Tools & Instrumentation
4.2.1
The following tools and instrumentation are necessary to perform combustion calibration of the
unit:
•
Digital Combustion Analyzer: Oxygen accuracy to ± 0.4%; Carbon Monoxide (CO) and
Nitrogen Oxide (NOx) resolution to 1PPM.
•
16 inch W.C. manometer or equivalent gauge and plastic tubing.
•
1/4" NPT-to-barbed fittings for use with gas supply manometer or gauge.
•
Small and large flat blade screwdrivers.
•
Tube of silicone adhesive
Installing Gas Supply Manometer
4.2.2
The gas supply manometer (or gauge) is used to permit the gas pressure to be monitored on
the downstream side of the SSOV during the Combustion Calibration procedures described in
paragraphs 4.5 (natural gas) or 4.6 (propane).
The gas supply manometer is installed at the upstream and/or downstream location(s) shown in
Figure 4-1.
Figure 4-1: Manometer Installation Locations
PROPANE
SSOV
NATURAL
GAS SSOV
TO AIR/FUEL
VALVE
MANUAL
SHUT-OFF
VALVE
1/4” PLUG & LEAK
DETECTION BALL VALVE
(Install manometer
here for Combustion
Calibration)