Option 8 – Continued
Step 3: Configure ALL C-More Units
On ALL Heating Boilers:
1. Go to the
Configuration
menu
item and set the
BST Menu
item to
Enabled
.
2. Go to the
Boiler Sequencing Menu
item
and set the
BST Mode
item to
BST Slave
(for now).
On MASTER only:
3. Go to the
BST Setpoint
item and enter the failsafe Setpoint.
4. Go to the
BST Setup Menu
item and set to
Enabled
.
5. Go to the
BST Setpoint Mode
item and select Remote
Setpoint
.
6. Go to the
BST Remote Signal
and select either
Network
.
7. Go to the
Head Temp Source
item and select
Network
.
8. Go to the
Header Temp Addr
item and
enter the Modbus Address (240).
9. Go to the
Header Temp Point
item and enter the Modbus Point (14).
When ALL C-More units have been configured:
10. Go to the
Boiler Sequencing Menu
item
of the desired Master
unit
and set the
BST Mode
item to
BST MASTER
.