Benchmark 750-3000 Installation & Startup Manual
SECTION 3 - START SEQUENCE
OMM-115_D
•
GF-200
•
5/9/2019
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 46 of
126
When there is a demand for heat, the following events will occur:
Start Sequence:
1. The
DEMAND
LED status indicator will light.
2. The unit checks to ensure that the Proof of Closure (POC) switch in the downstream Safety
Shut-Off Valve (SSOV) is closed. See Figure 3-1a through 3-1d for SSOV location.
Figure 3-1a: BMK 750 & 1000 SSOV Location
(P/N 22140-1 shown)
Figure 3-1b: BMK 1500 & 2000 SSOV Location
(P/N 22188 shown)
TO
AIR/FUEL
VALVE
MANUAL
SHUT-OFF
VALVE
LOW GAS
PRESSURE
SWITCH
HIGH GAS
PRESSURE
SWITCH
SSOV
SSOV
TO AIR/FUEL
VALVE
MANUAL
SHUT-OFF VALVE
NATURAL
GAS INLET
NATURAL
GAS INLET
LOW GAS
PRESSURE
SWITCH