Benchmark 750-3000 Installation & Startup Manual
SECTION 3 - START SEQUENCE
OMM-115_D
•
GF-200
•
5/9/2019
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 47 of
126
Start Sequence:
Figure 3-1c: BMK 2500: SSOV Location
(P/N 22190 shown)
Figure 3-1d: BMK 3000: SSOV Location (P/N 22171 shown)
3. With all required safety device switches closed, a purge cycle will be initiated and the
following events will occur:
a. The Blower relay energizes and turns on the blower.
b. The Air/Fuel Valve rotates to the full-open purge position and closes purge position
switch. The dial on the Air/Fuel Valve (Figure 3-2a and 3-2b) will read
100
to indicate
that it is full-open (100%).
c. The
VALVE POSITION
bargraph will show 100%.
TO
AIR/FUEL
VALVE
MANUAL
SHUT-OFF
VALVE
LOW GAS
PRESSURE
SWITCH
SSOV
SSOV
TO
AIR/FUEL
VALVE
NATURAL
GAS INLET
HIGH GAS PRESSURE
SWITCH
MANUAL
SHUT-OFF VALVE
LOW GAS
PRESSURE
SWITCH
NATURAL
GAS INLET