Benchmark Platinum-Edge: Operation-Service Manual
SECTION 8 – MAINTENANCE
OMM-0137_D • GF-211
•
7/16/2019
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 115 of 146
8.12 RETURNING THE BOILER TO SERVICE AFTER SHUTDOWN
After a prolonged shutdown (one year or more), the following procedures must be followed:
Placing The Boiler Back In Service After A Prolonged Shutdown Instructions
1. Review installation requirements included in Section 2 of the
Benchmark Platinum-Edge:
INSTALLATION Manual
(GF-210).
2. Inspect all piping and connections to the unit.
3. Inspect exhaust vent and air inlet duct work (if applicable).
4. Perform initial startup per Section 4 of this guide.
5. Perform the instructions in Section 5:
Safety Device Testing
, above, and all scheduled
procedures described Section 8:
Maintenance
.