Benchmark Platinum-Edge: Operation-Service Manual
FORWARD
OMM-0137_D • GF-211
•
7/16/2019
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 7 of 146
AERCO Technical Terminology Meanings
TERMINOLOGY
MEANING
EMS
Energy Management System; often used interchangeably with BAS
FM
Factory Mutual. Used to define boiler gas trains.
GF-xxxx
Gas Fired (an AERCO document numbering system)
GND
Ground
HDR
Header
Hex
Hexadecimal Number (0 – 9, A – F)
HP
Horse Power
HX
Heat Exchanger
Hz
Hertz (Cycles Per Second)
I.D.
Inside Diameter
IGN
Ignition
IGST Board
Ignition/Stepper Board, contained in Edge Controller
INTLK (INTL’K)
Interlock
I/O
Input/Output
I/O Box
Input/Output (I/O) Box currently used on Benchmark boilers
IP
Internet Protocol
ISO
International Organization for Standardization
Lbs.
Pounds (1 lb = 0.45 kg)
LED
Light Emitting Diode
LN
Low Nitrogen Oxide
MA (mA)
Milliampere (1 thousand
th
of an ampere)
MAX (Max)
Maximum
MBH
1000 BTUs per Hour
MIN (Min)
Minimum
Modbus®
A serial, half-duplex data transmission protocol developed by AEG
Modicon
NC (N.C.)
Normally Closed
NO (N.O.)
Normally Open
NOx
Nitrogen Oxide
NPT
National Pipe Thread
O
2
Oxygen
O.D.
Outside Diameter
OMM, O&M
Operation and Maintenance Manual
onAER
AERCO’s on-line remote monitoring system
PCB
Printed Circuit Board
PMC Board
Primary Micro-Controller (PMC) board, contained in the Edge
P/N
Part Number