Lync WQ-RS
SECTION 3: OPERATION
L- OMM-005_A
•
2/23/2022
Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
20
of
34
Control Box Installation
1. Drill the enclosure as needed and install liquid-tight fittings for the wiring.
2. Mount the enclosure in the desired location on the RO system.
3. Bring the wires from the peripheral devices into the enclosure and connect them to the
appropriate terminals. (See Figures 2- and 3-4 through 3-6.)
4. Install the conductivity cell in the permeate line (see Figure 3-7 and 3-8 for conductivity cell
installation instructions).
5. Connect the conductivity cell to the terminals on the CPU Board (see Figure 3-4). Repeat Steps
6 & 7 for the Feed Conductivity cell if your system will utilize both feed and permeate
conductivity measurement.
6. Provide power to the RO system.
7. Press the
System On/Off
switch to turn the system ON.
8. Select the Program Mode (see Figure 3-7 and 3-8, and Table 2). The default is Program 1, which
is a general purpose setting. Use Program 2 if your system is not equipped with a flush valve.
9. Make any other changes you want to the settings. Press
System On/Off
to save your
changes.
10. The controller is now ready for service.
NOTE:
The above information is provided in case the controller is purchased as a standalone
product.
Figure 3-9
Controller Programming. Accessing the hidden menus
1. With the System
ON, press and hold
the
UP
and
DOWN
arrows.
2. With the
UP
and
Down
arrows depressed, press the
System On/ Off
switch. The
menu will switch to the RO
Presets menu shown here.