ScaleNet
®
Commercial Water Treatment Systems
Top view with optional bypass
ScaleNet
®
Commercial Water Treatment Systems
Installation – 1" Pipe
The flow thru the Commercial Anti-Scale System is upward. Therefore, the inlet and outlet connections
are opposite of traditional water treatment equipment.
The flow rate must not exceed the maximum specified flow rate of the system. A flow control devise
will be required for applications where flow rates may exceed the maximum specified flow rate.
Part No.
Tank Size Pipe Size
Max Service Flow
M8407-COM 7x44
1"
10
gpm
M8408-COM 8x44
1"
12
gpm
M8409-COM 9x48
1"
16
gpm
M8410-COM 10x54
1"
20
gpm
M8412-COM 12x52
1"
30
gpm
Installation Instructions:
1.
Place system on a smooth flat surface.
2.
Install the fittings and / or the bypass (see separate instructions). Slide the
nut on first then the split ring and o-ring.
3.
Connect incoming cold water to the inlet of the system.
4.
Connect system outlet to service water of the house.
5.
Partially open a valve down stream of the system to allow the air to purge
from the system.
6.
Slowly open inlet valve and allow the system to fill with water.
7.
Close the down stream valve five minutes after all the air has been purged
from the system and plumbing. This flushes any fines out of the system.
8.
Check for leaks and repair as required.
9.
System is ready for use.
Conditions for Operation:
•
Minimum pressure 15 PSI
•
Maximum pressure 125 PSI
•
Minimum operating temperature 34 F
•
Maximum operating temperature 120 F
•
Water pH range 6.0 to 9.0
•
Maximum feed water hardness is 75 grains per gallon.
•
Hydrogen sulfide, iron, and manganese
•
Pre-treatment required
•
Maximum chlorine 3 ppm, de-chlorination recommended
•
Oil and grease should not be present
Warning - Do not exceed specified flow rates
Inlet
Note: Do not use where water is microbiologically unsafe or with water of unknown quality without adequate disinfection before or after the unit.
System must be maintained according to manufacturer's instructions. Pre-treatment for sediment, Iron, Hydrogen Sulfide, Manganese, hydrocarbons
and copper may be required depending on conditions. Install systems in new facilities with copper pipe after six weeks of water use.
Outlet