7
IOM-UpGradeKit-SentryPlusAlert2
2013
EDP# 2916013
© 2020 Watts
1. Using a smart phone or tablet,
scan the QR code on the side
on the Cellular Gateway, or go
to https://connected.syncta.
com
2. When prompted, enter the
Device ID. The Device ID is the
set of numbers printed beside
the QR code on the side of the
Cellular Gateway.
3. Follow the prompts to create
a Syncta account, or if you are
an existing Syncta user, log in
to your account. The device
can be registered to multiple
accounts.
4. Once the device is regis-
tered to your account, follow
prompts to add notifications.
To manage alerts, login to your
account on Syncta.com.
Installation and Operation
5. Registering SentryPlus Alert
Valve Travel
VALVE SIZE - INCHES
1
1
⁄
4
1
1
⁄
2
2
2
1
⁄
2
3
4
6
8
10
Travel - Inches
3
⁄
8
3
⁄
8
3
⁄
8
5
⁄
8
3
⁄
4
1
1
1
⁄
2
2
2
1
⁄
2
Valve Cover Chamber Capacity
VALVE SIZE - INCHES
1
1
⁄
4
1
1
⁄
2
2
2
1
⁄
2
3
4
6
8
10
fl. oz.
4
4
4
10
10
22
70
U.S. Gal
1
1
⁄
4
2
1
⁄
2
1. Open the Control Box. Apply power.
2. Pour an adequate amount of water into the RPZ Relief Valve
Air Gap until the DELAY counter begins to count down. This
indicates the Flood Sensor is properly installed and is sensing
water in the discharge piping.
3. Trap water in the discharge piping. The Solenoid will energize
when the duration of time delay elapses. The FLOOD LED will
be solid orange. The valve will close and must be manually
reset. Adjust the Time Delay to the customer/project specifi-
cations.
4. As a final test, simulate an actual RPZ Relief Valve discharge
and observe the floor drain for excessive pooling or flood-
ing. Re-adjust the time delay and Adjustable Closing Speed
Control as needed to achieve the desired valve closure time.
Start-up Instructions